Get a building permit

Factory construction
Electromechanical systems
TMEIC 3-phase medium voltage motor
TMEIC 3-phase low voltage motor
Medium Voltage Equipment TMEIC Japan

Apply for a factory building permit, Prefabricated steel buildings are an extremely important step in the construction of industrial buildings. However, this process is often a bit difficult for foreign firms. Therefore, if you are looking for a reputable unit to apply for a license to quickly build a factory, Tan Hoang Phat is the number one choice for you.

 

The importance of building permits

What is a building permit application?

 

A construction permit is a legal document issued by a competent state agency in a certain form based on the wishes of the people and confirms that the investor's construction is in accordance with the law.

Construction permits are a tool for state management agencies to manage the construction in their respective areas according to the approved urban planning orientation to determine the construction of the people.

    There are 3 types of construction permits:

  • Applying for a new construction permit;
  • Apply for a permit to repair and improve works;
  • Relocation permit works.

Procedures for applying for a factory construction permit are always interested by Vietnamese as well as foreign investors before planning to invest in building a factory in Vietnam. Types of administrative paperwork and procedures can be very troublesome and time consuming.

 

Profile for a building permit includes what?

 

. Application for a construction permit;

. Certificates of land use rights

. Factory design drawing

. Statement of capacity and experience of design organization;

. Certificate of design, architecture, structure practice, presiding over the design in drawing;

. Certificate of fire safety design approval, or fire protection plan;

. Decision approving reports on environmental impact assessment;

. Project approval decision, investment decision;

. Written evaluation design projects with the requirements specified by the professional body for building evaluation. 

 

The process of applying for a factory building permit

 

Apply for a factory building permit, Prefabricated steel buildings are an extremely important step in the construction of industrial buildings. However, this process is often a bit difficult for foreign firms. Therefore, if you are looking for a reputable unit to apply for a license to quickly build a factory, Tan Hoang Phat is the number one choice for you.

 

Step 1: Prepare documents to apply for a construction permit

 

An application for a building permit form.

A certified copy of one of land use right papers in accordance with the land law.

A certified copy of the certificate of business registration or investment certificate.

2 sets of workshop design drawings, each set includes:

  • Drawings of the total ground of the project or the total ground plan for each phase of the project, the rate of 1/100 - 1/500.
  • Ground drawing of each work on the land lot, scale 1/100 - 1/500,  attached with the construction location diagram.
  • Drawings of main verticals and sections of each project, scale 1/50 - 1/200.
  • Foundation drawings of each work, scale 1/100 - 1/200 and foundation section of each project, scale 1/50, attached to the diagram of the connection to the rainwater drainage system, wastewater treatment, water supply, electricity supply, and communication, with the rate of 1/50 - 1/200.

Depending on the construction site, work size, construction properties, in comparison with the provisions of the regulations, construction standards; Standard, specialized standards and relevant legal regulations, Dossier requesting for construction permit must also supplement the following documents:

  • Drawings of fire prevention and fighting system (fire protection), scale 1/50 - 1/200, stamped for approval for the works on the list of requirements for appraisal and approval of fire prevention and fighting plans in accordance with law on fire protection.
  • Report on the appraisal result and the investor's written approval of technical design or construction drawing design according to regulations; Design verification report issued by state management agency in charge of construction or consultancy organization having full capacity under regulations on implementation, enclosed with signed main bearing structure drawings, stamp of organization or individual designing. 
  • The project approval decision enclosed with the investment approval document of a competent state agency, documents for consultation on basic design (if any) of state management agencies on specialized construction works according to regulations.
  • The investor's written approval of construction measures to ensure safety for works and neighboring works, for works built with basements.
  • Capacity manifest, experience of the design organization, the individual is the headmaster, design the design with the form enclosed with a certified copy of the practice certificate of the manager, design lead. 

 

Step 2 Submit the application for construction permit to the People's Committee of wards and communes

 

After being fully prepared, We proceed to apply for a factory construction permit at the reception and result return department of the People's Committee of the commune or ward.

 

Step 3 The urban management office receives the application for construction permit to consider issuing the permit

 

The Urban Management Division receives dossiers from the commune and ward People's Committees, checks and submits them to the People's Committees of provinces and cities for consideration and licensing.

 

Step 4 Get a license at the results-returning department of the People's Committee of the province or city

 

Finally, just wait for the results after having been fully licensed.

 

 

All steps to apply for a construction permit are based on the legal basis of the following administrative procedures:

  • Law on Construction dated November 26, 2003;
  • Decree No. 64/2012 / ND-CP dated September 4, 2012 of the Government on granting construction permits;
  • Circular No. 10/2012 / TT-BXD dated 20/12/2012 of the Ministry of Construction detailing some contents of Decree No. 64/2012 / ND-CP dated September 4, 2012 of the Government on the construction permit;

 

Processing time for construction permit application

 

Usually no more than 1 month from receipt of a valid application (except holidays, New Year). However, preparing to complete a valid dossier is quite difficult for businesses.

And if the business doesn't have a lot of experience, relationship getting a building permit will be quite a long time and really very time consuming. Project completion time may be affected.

It is because of understanding and grasping the need to apply for a quick construction permit of the business. Tan Hoang Phat Company we accept to do legal services related to factories such as: get a permit to build prefabricated steel buildings, work ownership license, fire prevention license, ... ..

  • Commitment to completion time: no more than 20 days after receiving the request from the customer
  • Contact: Hotline: 0911.066.518, 0969.002.382

 

 

CONTACT OFFICE
Tan Hoang Phat Design and Construction Investment Company Limited
Address: 5th Floor, Central Point 219 Trung Kinh, Yen Hoa Cau Giay, Hanoi City
 Website: http://diencongnghiep.top
 Email: diencongnghiep.top@gmail.com

Facebook: https://www.facebook.com/congtytanhoangphat
Hotline: 0911.066.518, 0969.002.382