Preparing steps for factory construction investment, warehouse and operating use;

Step 1: Make preliminary plans so that; demand for use, Investment funds, construction land fund, the regulations on the construction and future development orientation.

Step 2: Prepare a plan to prepare construction investment documents; Geological Survey, designing construction technical documents.

Step 3: Apply for a license; Making an environmental impact assessment report, apply for a fire protection system license, Get a building permit.

Step 4: Construction commencement, Construction works, electromechanical system installation, installation of production machinery and equipment system (if any), conduct acceptance and handover of works, acceptance of fire protection system.

Step 5: Completion of the work with the local governing body to obtain the work ownership certificate.

Step 6: Operation and use of works and warranty inspection, construction maintenance during use.

 

General introduction:

Factory construction is the first step as well as the most difficult step for investors. to meet production and business needs. Before starting the plant, investors were always about questions such as area distribution, building materials, large and small scale works, progress in terms of time, construction costs, …

In the following, Tan Hoang Phat will inform you about the process of steps necessary when constructing the plant, as well as things to note during the implementation process so that you can choose for yourself the perfect solution.

 

 

up plant construction diagrams:

 

Making a construction plan is the most important first step because when starting construction, the cost will be very high and also the amounts incurred. Planning ahead is time-consuming, but it helps investors and builders to grasp everything, proceed in accordance with production needs, minimize the costs incurred, the confused incident during its construction, optimize the amount to pay, completion of works in accordance with the scheduled time.

The mapping process takes place in 2 steps:

 

Make preliminary factory construction scheme

 

Understand the needs of construction investors in the consulting process, Architectural engineers will gather detailed information through schematic drawings. Depending on the major of work, production lines and technology machinery to the size of each plant has different sections. Overall drawing board, details of each room and super realistic drawing techniques will help investors see more details about the future factory.

In terms of density, construction items, inner paths, exit, fire protection activities, plants and trees, ... All are clearly shown at this drawing stage.

 

Construction drawings construction of the plant

 

 

Factory construction drawing is the next stage, is also holding a key role of the project. Structural details in terms of architecture, foundation pouring process, steel frame installation, the details help to link together, construction items, ... are shown in this drawing:

  • Storehouse
  • Factory
  • Office
  • Kitchen space
  • Electrical circuit
  • Broadcast station
  • Parking lot, guard house
  • Of entrance, wall, the gate,…

The stage of applying get a building permit is also implemented at the same time with this drawing.

This is also the foundation for all construction activities, factory production later.

 

Embark on construction on planned works

 

Basic plant construction has 5 steps. However, it can still vary depending on different manufacturing sectors:

 

  • Construction pouring foundations for works.
  • Choose and apply a good steel mold for the factory.
  • Installation of prefabricated workshop and mounting of corrugated iron roofs, canopy.
  • Arranging the placement of technological equipment after the plant is completed.
  • Installation of specialized equipment, equipment used for production processes.

 

 

Construction of factory foundation

 

After completing the initial steps, Construction contractor side will start pouring foundation for the factory. We will choose between laying a single foundation or a pile foundation depending on the geographic topography and operational needs of the plant. For precision with mill steel columns, Care should be taken when pouring concrete to have a connection with the process of laying the foundation bolts. After pouring concrete for the foundation, the construction side will dump expensive directly and harden the soil,  solidify in preparation for the next stage.

 

Construction of pre-engineered steel frame construction

 

This stage is done in parallel with the foundation pouring to be able to install the pre-engineered steel frame as soon as the foundation has reached sufficient hardness. constructing 2 parallel phases will help the construction progress quickly, save time.

 

Construction and construction of steel frames for factories

 

Safety factors and quality must be top priorities in the construction phase of the plant construction, avoid unnecessary risks in significant levels.

 

 

Construction of complete factory items

 

Immediately after the construction of the steel structure is completed is the finishing work such as building a wall, cladding, slice, plaster ceiling, floor ...

Gypsum ceiling cladding, tiled for the floor, finishing wall panels, glass door, window, gate,...

Construction of plant power lines

 

Construction of electromechanical systems.

 

Completion of works, handed over to the investor uses

 

So Tan Hoang Phat has disseminated to customers to better understand the construction items of the factory. If you have any needs, please contact us at the following address:

 

CONTACT OFFICE
Tan Hoang Phat Design and Construction Investment Company Limited
Address: 5th Floor, Central Point 219 Trung Kinh, Yen Hoa Cau Giay, Hanoi City
 Website: http://diencongnghiep.top
 Email: diencongnghiep.top@gmail.com

Facebook: https://www.facebook.com/congtytanhoangphat
Hotline: 0911.066.518, 0969.002.382