Clean room construction
11/08/2020
Nowadays, the use of clean spaces for production, packing, Experiment and research have become an indispensable part of the industry.
Central air conditioning
11/08/2020
Central air conditioning – Maintain a stable room air in terms of temperature, humidity, cleanness, and change in air composition, air pressure. Forced air conditioning through refrigeration or heating equipment, moisture spray, desiccant drying, oxygen generation, negative ion, ...
Construction of VRV air conditioning system
10/08/2020
Hot summer with high temperatures ranging from 38 - 42 degrees C has a great impact on health as well as productivity in factories, office building,... The best solution in these cases is the construction of VRV air conditioning system.
Factory design
10/08/2020
When building, your factory design profile is maximized for effective performance or not? Is the quality of the workshop safe and sustainable over time? These issues all need to depend a lot on the expertise of experienced factory design consultants.