Project Vision Automation Vina
09/06/2020
Vision Automation Vina Excution work: Install EPS panel inside, Lighting and socket, Communication work, Air conditioner of NAGAKAWA, Fire fighting work, cable power, Epoxy paint 0.3mm, Plumping work. Schedule: From 03/2019 to 05/2019
JEIL FILTER VINA FACTORY
09/06/2020
JEIL FILLTER VINA FACTORY Excution work: Install transformer 400kva, Lighting and socket, Communication work, Air conditioner of NAGAKAWA, Fire fighting work, cable power work. Schedule: From 05/2018 to 08/2018. Thuanthanh III IP, Thuanthanh Bac Ninh province
Central point tower
09/06/2020
Central point tower 219 Trungkinh Excution work: Install Air conditioner type Center VRF of TOSHIBA, indoor unit type connect duct and install partition inside. Schedule: From 03/2019 to 05/2019
CAP Global factory project
09/06/2020
Project: CAP Global factory Add: Luong Son IP Hoa Binh Province Items: M&E work; Air conditioner, Cleaning room, Electrical, Fire fighting, Plumping Schedule: From 07/2019 to 11/2019